There are a few more deck 2 windows that need attention - likely including welding not just gasket work.   The spa 'thermal suite' needs some work as well, basically unchanged since commissioning except for wear [slow drains, missing tiles, rust]. I recall that the spa was originally targeted for a makeover in a  dry dock /availability period [2020?] the COVID lockdown forced rescheduling.