Motorman23 Posted January 7, 2014 #1 Share Posted January 7, 2014 I saw a recent note that says that there is construction on Spangler Blvd that goes from the Crown Plaza Hotel to the Port. I was wondering if anyone has any experience with how much time delays have been noted on this route to the port if any since the construction started. I am trying to meet someone at the port and timing when to get started. Mike Link to comment Share on other sites More sharing options...
royalcruz Posted January 7, 2014 #2 Share Posted January 7, 2014 I can't say firsthand, as I've only been going to the port through the north entrance, but this is not a major hwy or interstate so I doubt that construction delays will be longer than 0-5 minutes. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now