Jump to content

twangster

Members
  • Posts

    12,045
  • Joined

Everything posted by twangster

  1. A ship heading into the new locks. We are taking on the crew that will handle the lines onboard.
  2. Once past the Centenial Bridge we soon reach the pint where the path to the new locks diverges to the right.
  3. From here we leave Gatun Lake and Culebra Cut. Thas was some of the hardest work to complete the canal.
  4. With that we are around 85 feet above sea level and our lake cruise begins. Looking toward the earthen damage that created the lake. Flood control and hydroelectric power generation.
×
×
  • Create New...